New Jersey Department of Military and Veterans Affairs
110,000 SF New Construction
This new facility is part of the four phase Master Plan referred to as the Consolidated Logistics Training Facility. It is comprised of the following;
- Vehicle Service Area – 18 general work bays to accommodate large size tracked armored vehicles. The vehicle service area is equipped with a 15-ton crane, under-slab lubricant reclamation system and a state-of-the-art exhaust capture system.
- Specialty Services Area – Vehicle Wash Bay, Paint Preparation Bay, Paint Stripping Bay. Paint Spray Booth Bay, Body Shop and Welding Shop. There is also an Engine and Transmission Dynamometer Bay (transmission shop)
- Support Services Area – Machine Shop, Radiator Shop, Computer Shop, Missile Repair Shop, Carpentry Shop, Canvas Shop, Glass Shop and Communication & Navigation Instrument Shop
- Training and Administration Area – Offices, Locker Rooms, Dining Facility, Physical Training Room, Instructional Rooms and Multi-Purpose Room